In preparation for returning students, faculty and staff, Facilities Management conducted an in-depth assessment and provided the following services to ensure the functionality of campus buildings:
- HVAC system assessment (full system operational testing: air handling units, filters, ducts, supply fans, dampers, registers and exhaust fans)
- Water system tested and flushed
- Installed hand sanitizing stations at all building entrances
- Installed hand sanitizing stations at the entrance of all General Assignment classrooms
- Installed and monitor COVID-19 building entrance signage
Custodial Detailed Cleaning Projects
While you were away we took the time to do a detailed cleaning of many areas of campus.
We cleaned, scrubbed, and waxed the flooring in many areas, and shampooed the carpeting where accessible.
223 - Theater and Dance – 1st and 2nd floor hallways, the 2600 classroom, design room and lecture hall
235 - LSB
243 - ICA
251 - East Psychology
275 – Gervirtz Hall
317 - CSO
321 – MSI Trailer
334 – MSI Trailer
338 – MSI Trailer
342 – MSI Trailer
376 – PD Trailer
352 - Child Care Club House
355 – Child Care
370 - Design & Construction
371 – Design & Construction
378 – Communications Trailer
379 - Communications Trailer
437 – Facilities Management
439 – Facilities Management
465 – MSI Trailer
494 - CCS
507 – Mail Services
512 – Bio Engineering
515 - HSSB
516 - Rec Cen
517 - Mosher House
526 – Webb Hall
528 - South Hall – 1600, 2500, 2600, 2700, 3700, 4600, 5600, 5700, 6600
531 - Music
533 - Rob Gym
534 – Arts - Classrooms 1356, 1341, 1345, 1349, 2636, 2220
535 - North Hall
538 - Campbell Hall – dressing rooms, Lobby and aisles
554 - Snidecor – 1st and 2nd floors
560 - Phelps Hall
564 – Girvetz Hall – classrooms including 1004
568 – SAASB
572 - Broida Hall – Lecture Halls 1610, and 1640
573 – Buchanan Hall – Lecture Hall
574 – Public Safety
575 - Transportations
578 – Harder South
580 – Harder Stadium
589 – Storke Tower
594 – Facilities Management
941 – E. Hall – Lecture hall, lobby, hallway and 2nd Floor kitchen
948 - IV Theater – Lecture Halls and Lobby
972 – FM Fiscal
We also did a detailed cleaning in a variety of buildings. Detailed cleaning includes:
- Scrubbing all student desks and chairs
- Removing gum from all tables, chairs, and desks
- Scrubbing and high dusting all walls, light fixtures, and vents
- Cleaning all doors, door frames and door handles
- Dusting all exterior and interior stairs and rails
- Cleaning all elevators
- Cleaning all areas of contact in restrooms including walls, toilets, urinals, sinks, doors, and partitions
232 - Chemistry
235 - LSB
243 - ICA
251 - East Psychology
275 – Gevirtz Hall
276 – SSMS
300 - Classrooms
322 - MSI Trailer
334 - MSI Trailer
338 - MSI Trailer
342 - MSI Trailer
319 - MSI Trailer
387 – Modular Classrooms
402 – Arts & Lectures
451 – Military Science
465 - MSI Trailer
479 - Old Gym
489 – Sycamore Hall
494 - CCS
504 – BIO III
507 – Mail Services - Restrooms
512 – Bio Engineering
515 - HSSB
516 - Rec Cen
520 - MSI
521 - Bren Hall
525 - Library – Floors 1 - 8
526 – Webb Hall
528 - South Hall
531 - Music Library – 1st floor lobby area, 2nd floor
533 - Rob Gym
534 - Arts
535 - North Hall
538 - Campbell Hall – Restrooms, dressing rooms
544 - Noble Hall - offices in 1st and 2nd floor
546 - Woodhouse
551 – Psychology - 1 - 3 floor offices and labs
552 – Cheadle Hall
560 – Phelps Hall
563 – Ellison Hall
564 - Girvetz – all classrooms, 1004
565 - EHS – offices
568 - SAASB
570 – Physical Science
571 - Bio II
572 - Broida Hall – Lecture Halls 1610, and 1640, 6th floor offices
574 – Public Safety
578 – Harder South
580 – Harder Stadium - Locker rooms, showers and restrooms
588 - Student Health
589 – Storke Tower - Offices and restrooms
935 – Engineering Trailer
936 – Chemistry Trailer
** The buildings listed were completed in their entirety, unless otherwise noted. If any areas are in need of additional attention or touch-ups prior to staff returning, please submit a work request. **